VIBRATION MONITORING CASE STUDY:
North System Renewal Project

Protecting Property & Community Relations with Inzwa Vibration Monitoring Solutions

Situation:

The east phase of Denver’s multi-year, North System Renewal Project called for the installation of more than a mile of new, 60-inch pipeline straight through several residential neighborhoods of Wheatridge, CO.  To mitigate risk and maintain positive community relations, general contractor Garney Construction turned to Kilduff Engineering to provide vibration monitoring for the length and duration of the project. 

And Kilduff Engineering turned to Inzwa and their Veva III vibration monitors.

Vibration Monitoring, Northwater Project, eastern phase, Wheatridge, CO
Inzwa Veva III Vibration Monitoring Device.jpeg

Solution:  Four Inzwa Veva III
vibration monitors playing "leapfrog"

Plans required excavation of over 6,000 feet of existing residential roadway to install the pipeline, potentially affecting several hundred households.  Four Inzwa Veva III devices were deployed to measure potential vibrational impact to residential structures closest to the point of excavation.  As the project commenced, each device was relocated to stay abreast with the project’s progress, essentially “leapfrogging” their way forward through the neighborhood. Given their small size and fully integrated design, deployment couldn’t have been easier; Kilduff staff engineer Banks Irelan didn’t even need to affix the devices to the buildings.  “It was really easy,” Irelan exclaimed.  “I just put it down outside the house, turned it on, put a sandbag on it and let it run.”  This made relocating each device to the next house in line as excavation commenced simple and easy, too.  “It was pretty perfect,” Irelan said.

Irelan especially appreciated the fact that the Veva III came fully integrated and activated with both the Inzwa Cloud and cellular service, requiring no additional components to be installed.  The fully integrated battery also ensured that monitoring for the life of the project wouldn’t be an issue, either.

Site of Inzwa Veva III vibration monitoring device.jpeg

Vibration Monitoring Reporting: Inzwa keeps things simple

Keeping others informed with Inzwa Cloud’s automated reporting was a simple process as well.  Irelan was able to generate and customize weekly automated reports for the project stakeholders within minutes.  “Reporting parameters required that the addresses of each home being monitored be added to the weekly report,” Irelan explained.  “It took maybe 15-30 minutes to update on the Inzwa system, but the interface is really easy, so it’s all good.”

This phase of the Northwater Pipeline Project is due to be complete before the end of 2021. 

vibration monitoring during excavation North System Renewal Project.jpeg
Vibration Monitoring North Ridge project.jpg

It was really easy.  I just put it down outside the house, turned it on, put a sandbag on it and let it run.  It was pretty perfect.

Banks Irelan
Kilduff Engineering